What the filing says
A public-record reading of the proposed work.
Replacement of split air conditioning unit all existing duct work to remain. No change in use egress and occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 42-story elevator apartment building built in 1998, with 340 homes, on a 10,292 sq ft lot.
- Built
- 1998
- Floors
- 42
- Residential units
- 340
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- BPC
- Lot area
- 10,292 sq ft
- Building area
- 357,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 66 notices on file; the most recent was issued Jul 21, 2026.
- Construction
Issued Jul 21, 2026 — FAILURE TO MAINTAIN FACADE AND APPURTANCES DUE TO INCIDENT WHICH OCURRED WHERE UNSECURED OUTDOOR FURNITURE FELL OF ROOF & CAUSED DAMAGE TO ADJACENT PROPERTY EXP4,EAST ELE. REMEDY:OWNER TO SECURE SEATING/TABLES @ TERRACE OR BALCONY. QEWI TO INSPECT/CONFIRM CODE COMPLIANCE OF PARAPET HEIGHTS. DEADLINE/SUBMISTION CERT 7/23/2026
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01421972-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01421972-I1
- BBL
- 1000160210
- Postal code
- 10282 · 53 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 350
- Proposed dwelling units
- 350








