NYC DOB record · B00075817-I1

41 Varick Avenue

41 Varick Avenue, Brooklyn, NY 11237

Alteration filing in East Williamsburg, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00075817-I1

41 Varick Avenue

Brooklyn, NY 11237

Alteration filing · status dated May 5, 2024

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00075817-I1 as a alteration filing at 41 Varick Avenue, Brooklyn, NY 11237. Its latest published status category is Recorded as completed, dated May 5, 2024. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
May 5, 2024
Proposed scale
Not stated in this filing
Applicant of recordSee the 789 filings that name Royal Engineering, P.C
FiledSep 4, 2018
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$7,300

What the filing says

A public-record reading of the proposed work.

Installation of heavy duty sidewalk shed as per plans for remedial repairs. no change in use, occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the NYC 2014 building code.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story factory or industrial building built in 1920, with 12 homes, on a 20,000 sq ft lot.

Built
1920
Last altered
2005
Floors
4
Residential units
12
Building type
Factory or industrial building
Land use
Industrial and manufacturing
Zoning district
M1-2
Lot area
20,000 sq ft
Building area
66,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 47 notices on file; the most recent was issued Dec 1, 2024.

  • Failure to post energy

    Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to

    Issued Aug 2, 2022 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to

    Issued Jun 1, 2022 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00075817-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00075817-I1
BIN
3070655
BBL
3029990024
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source