NYC DOB record · B00478118-I1

410 Kingsland Avenue

410 Kingsland Avenue, Brooklyn, NY 11222

Alteration filing in Greenpoint, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00478118-I1

410 Kingsland Avenue

Brooklyn, NY 11222

Alteration filing · status dated Oct 19, 2021

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00478118-I1 as a alteration filing at 410 Kingsland Avenue, Brooklyn, NY 11222. Its latest published status category is Approved, dated Oct 19, 2021. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 19, 2021
Proposed scale
Not stated in this filing
Complete building dossierView all 6 filings associated with BIN 3337727Applicant of recordSee the 39 filings that name Guth DeConzo Consulting Engineers
FiledApr 2, 2021
Current recordApproved
Proposed scaleNot specified
Recorded cost$25,000

What the filing says

A public-record reading of the proposed work.

Installation of new sprinkler system for energy storage system

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a factory or industrial building built in 1968, on a 433,000 sq ft lot.

Built
1968
Last altered
2009
Residential units
0
Building type
Factory or industrial building
Land use
Industrial and manufacturing
Zoning district
M3-1
Lot area
433,000 sq ft
Building area
41,688 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00478118-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00478118-I1
BBL
3026120001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0