What the filing says
A public-record reading of the proposed work.
Renovation of an existing residential unit PHC on the penthouse level in a multi-family structure. Kitchen to be replaced inside of unit, no change in location of plumbing fixtures; window openings to be enlarged; no change to use or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story condominium built in 1958, with 189 homes, on a 17,473 sq ft lot.
- Built
- 1958
- Floors
- 20
- Residential units
- 189
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R10
- Lot area
- 17,473 sq ft
- Building area
- 212,621 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 73 notices on file; the most recent was issued May 26, 2021.
- Fail to certify class
Issued May 26, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- (other bldgs types) - elevator affirmation of
Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
- (other bldgs types) - elevator affirmation of
Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01297668-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01297668-S1
- BBL
- 1013657501
- Postal code
- 10022 · 871 filings
- Review type
- Standard Plan Examination
- Existing stories
- 20
- Proposed stories
- 20
- Existing dwelling units
- 189
- Proposed dwelling units
- 189








