NYC DOB record · M01451015-I1

412 East 116 Street

412 East 116 Street, Manhattan, NY 10029

Alteration filing in East Harlem (North), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01451015-I1

412 East 116 Street

Manhattan, NY 10029

Alteration filing · status dated Oct 20, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01451015-I1 as a alteration filing at 412 East 116 Street, Manhattan, NY 10029. Its latest published status category is Approved, dated Oct 20, 2026. The filing records 4 proposed stories and 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 20, 2026
Proposed scale
4 proposed stories and 4 proposed dwelling units
Applicant of recordSee the 21 filings that name Michael Muroff Architect LLC
FiledSep 2, 2026
Current recordApproved
Proposed scale4 stories
Recorded cost$50,000

What the filing says

A public-record reading of the proposed work.

Filing for minor facade re-pointing at exposure #1 and #4. filing to satisfy violation #35733179p. no change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1900, with 4 homes, on a 1,880 sq ft lot.

Built
1900
Last altered
1984
Floors
4
Residential units
4
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7B
Lot area
1,880 sq ft
Building area
3,515 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Aug 31, 2026.

  • Construction

    Issued Aug 31, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#370571 VIO#072926PI11101RJ DATED 07/29/2026 REQUIRNG OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/29/2026 AS OF 08/31/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER #072926PI11101RJ

  • Construction

    Issued Jul 29, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD MULT MASONRY CRACKS AT VARIOUS LOCATIONS ON EXP1&4,ALSO OBSEVD SEVERLY HAZ SAGGING/CRACKED DECORATIVE MASONRY ABOVE MAIN ENTRANCE TO BLDG. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 8/29/2026

  • Immediate

    Issued Jun 24, 2008

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01451015-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01451015-I1
BIN
1053069
BBL
1017090142
Review type
Professional Certification
Existing stories
4
Proposed stories
4
Existing dwelling units
4
Proposed dwelling units
4
General construction