NYC DOB record · B00437310-I1

415 Manhattan Avenue

415 Manhattan Avenue, Brooklyn, NY 11222

Alteration filing in Greenpoint, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00437310-I1

415 Manhattan Avenue

Brooklyn, NY 11222

Alteration filing · status dated Jan 11, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00437310-I1 as a alteration filing at 415 Manhattan Avenue, Brooklyn, NY 11222. Its latest published status category is Recorded as completed, dated Jan 11, 2022. The filing records 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jan 11, 2022
Proposed scale
10 proposed dwelling units
Complete building dossierView all 7 filings associated with BIN 3067909Applicant of recordSee the 51 filings that name Ap Consulting PLLC
FiledDec 8, 2020
Current recordRecorded as completed
Proposed scale10 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the NYC building code. sidewalk shed filed under separate application

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 2020, with 9 homes, on a 2,500 sq ft lot.

Built
2020
Floors
6
Residential units
9
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
M1-2/R6A
Lot area
2,500 sq ft
Building area
8,138 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00437310-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00437310-I1
BBL
3027230030
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
10