What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story garage or fuel station built in 1931, on a 6,300 sq ft lot.
- Built
- 1931
- Last altered
- 1999
- Floors
- 1
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- M1-4/R6B
- Lot area
- 6,300 sq ft
- Building area
- 5,670 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 11, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Sep 22, 2025.
- Construction
Issued Sep 22, 2025 — UNLAWFUL ACTS OF FAILURE TO COMPLY WITH COMMISSIONER#062525CPS30601JL EMERGENCY WORK ORDER ISSUED ON 6/25/25 COMPLAINT#3A19413.AFTER OBSERVA TION OF CRACK PARAPET,MASONRY BRICK WALL & APPEAR TO HAVE SHIFTED AT E XP1 CAUSING HAZARD CONDITION TO PUBLIC SIDEWALK.REMEDY:IMMEDIATELY COM PLY WITH COMMISSIONER ORDER ISSUED ON 6/25/2025
- Construction
Issued Jun 25, 2025 — EMERGENCY WORK ORDER. OBSVD 1STROY STRUCT WITH MASONRY BRICK PARAPET WALL WHICJ APPEARS TO HAVE SHIFTED AND DISPLAYS CRACKING,IMMED INSTALL ADEQUATE SAFETY MEASURES TO PROTECT THE PUBLIC. IMMED RETAIN A NYSPE TO EVAL THE ENTIRE FACADE INCL PARAPETS AND PROVIDE METHOD OF STAB/ REPAIRING THE STRUCT. COMPLT ALL STAB/REPAIR WORK BY 07/04/2025
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01335520-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,348 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01335520-I1
- BIN
- 3008044
- BBL
- 3004680003
- Postal code
- 11231 · 2846 filings
- Review type
- Professional Certification
- Existing stories
- 1
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 5








