NYC DOB record · B00458377-I1

416 Ocean Avenue

416 Ocean Avenue, Brooklyn, NY 11226

Alteration filing in Flatbush, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00458377-I1

416 Ocean Avenue

Brooklyn, NY 11226

Alteration filing · status dated Dec 5, 2025

Current record
Approved
Proposed scale
9 stories
Dwelling units
90
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00458377-I1 as a alteration filing at 416 Ocean Avenue, Brooklyn, NY 11226. Its latest published status category is Approved, dated Dec 5, 2025. The filing records 9 proposed stories and 90 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 5, 2025
Proposed scale
9 proposed stories and 90 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 3116130Applicant of recordSee the 95 filings that name The Mtm Design Group, LLC
FiledJan 28, 2021
Current recordApproved
Proposed scale9 stories
Recorded cost$25,000

What the filing says

A public-record reading of the proposed work.

Decommission of existing nycwin telecom site. remove all antennas and equipment from the roof. no change in use, egress or occupancy. original installation approved under application # 302330635.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story elevator apartment building built in 1924, with 90 homes, on a 17,700 sq ft lot.

Built
1924
Last altered
2019
Floors
10
Residential units
90
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7A
Lot area
17,700 sq ft
Building area
131,355 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 38 notices on file; the most recent was issued Jul 8, 2026.

  • Construction

    Issued Jul 8, 2026 — EMERGENCY WORK ORDER DUE TO CRACKED/SPALLING STONE AT BALCONY BETWEEN 6-8FL @ EXP2, SOUTH ELEVATION. AT EXP#3 WEST ELEVATION STEP CRACKED & BULGING BRICK @ 9TH FL. AT EXP#4, NORTH ELEVATION, UNSECURED SHEET METAL.REMEDY:IMMED TAKE/PROVIDE SAFE MEASURES TO SECURE/PROTECT THE PUB.REM/SEC ANY/ALL LOOSE HANGING MATER U/SUPERVISION OF LICENSED PROF

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023

  • Hazardous condition (facade)

    Issued Oct 11, 2022 — CYCLE 9C UNSAFE REPORT FILED

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00458377-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00458377-I1
BBL
3050610040
Review type
Standard Plan Examination
Existing stories
9
Proposed stories
9
Existing dwelling units
90
Proposed dwelling units
90
General construction