What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy-duty sidewalk shed as per plans. live load 300 lbs per square foot. the sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story garage or fuel station built in 1916, on a 6,900 sq ft lot.
- Built
- 1916
- Floors
- 5
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- C8-3
- Lot area
- 6,900 sq ft
- Building area
- 27,366 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 41 notices on file; the most recent was issued Apr 7, 2025.
- Construction
Issued Apr 7, 2025 — PARTIAL VACATE ORDER - OBSERVED ON ACTIVE PARKING STRUCTURE CONSISTING OF CELLAR, 4FL, & ROOF: DETERIORATED CONCRETE SLAB & BEAMS @ LEVELS: CELLAR,2FL THROUGH 4FL AND ROOF. THESE CONDITIONS HAVE THEREFORE MADE THESE PARKING GARAGE LEVELS UNABLE TO BE OCCUPIED. REMEDY: IMMEDIATELY VACATE PG LEVELS: CELLAR, 2FL, THROUGH 4TH FL AND ROOF
- Construction
Issued Apr 5, 2025 — EWO OBSERVED CRACKED/SPALLING/LOOSE CONCRETE @ CONCRETE SLAB UNDERSIDE ,CONCRETE AT BEAMS,& COLUMNS @ MULTI LOCAT AT LVL 1-5 PARKING STRUCT & EXPOSED RUSTED REINFORCEMENT@ MULTI LOCAT & MULTI LVL.REMEDY:RETAIN A NYS RDP TO DIRECT/SUPERV THE IMMEDIATELY INSTALLATION OF SAFETY MEAS @ LVL 1-5 AND PROVIDE SHORING. WORK TO BE UNDR F/T SUPERV OF NYS RDP
- Fail to certify class
Issued Jan 22, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00900787-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00900787-I1
- BIN
- 1063559
- BBL
- 1021450012
- Postal code
- 10033 · 178 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 4
- Proposed dwelling units
- 4








