What the filing says
A public-record reading of the proposed work.
Install waterproofing on roof and patch/repair associated drains and concrete deck. Repoint/Stitch facade at 4th/5th floors along Exposures 1 and 2. Repair Expansion joints at Exposure 2/3 corner. Repair cast iron columns at elevator and fire stair
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story garage or fuel station built in 1925, on a 14,089 sq ft lot.
- Built
- 1925
- Last altered
- 2004
- Floors
- 6
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Transportation and utility
- Zoning district
- C8-3
- Lot area
- 14,089 sq ft
- Building area
- 85,176 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 54 notices on file; the most recent was issued Apr 11, 2025.
- Construction
Issued Apr 11, 2025 — REQUESTING ENGINEERING REPORT DUE TO MULTIPLE STEP CRACKS WITH BULGING CONDITIONS THROUGHOUT EXP 1&2. MORTAR JOINTS MISSING AT MULTIPLE AREAS AT EXP 1&2, ALSO THE DETERIORATION OF BRICKS.
- Construction
Issued Apr 7, 2025 — PARTIAL VACATE ORDER - ACTIVE PARKING GARAGE CONSIST OF CELLAR, 6FLS & ROOF. DETERIORATED CONCRETE SLAB & BEAMS @ LEVELS:CELLAR,4TH FL THROUG 6TH FL. THESE CONDITIONS HAVE THEREFORE MADE THESE PARKING GARAGE LEVELS UNABLE TO BE OCCUPIED. REMEDY: IMMEDIATELY VACATE PG LEVELS: CELLAR, 4TH FL THROUGH 6TH FL AND ROOF
- Construction
Issued Apr 5, 2025 — EWO PARKING STRUCT CONSIST OF 6 LVL.OBSERVED CRACKIG/SPALLIGCONCRETE SLAB, CONCRETE @ BEAMS, CONCRETE COLUMN & CRACKED/SPALLIG BRICK/FIRE PROOFING AS WELL AS EXPOSED/RUSTED REINFORCMNT @ MULTI LOCAT.REMDY:RET -AIN A NYS RDP TO DIRECT/SUPERV THE INSTALLN OF SAFTY MEAS @CELLAR,GL ,3-6 & PROVIDE SHORING OF FAILING STRUCTAL ELEMENT.PROVIDE DAILY PR
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01245748-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01245748-I1
- BIN
- 1063560
- BBL
- 1021450015
- Postal code
- 10033 · 146 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 0
- Proposed dwelling units
- 0