What the filing says
A public-record reading of the proposed work.
Seabury hall - removal and installation of interior partitons and finishes. new elevator shaft walls. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story educational building built in 1931, on a 77,773 sq ft lot.
- Built
- 1931
- Floors
- 6
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R7B
- Lot area
- 77,773 sq ft
- Building area
- 133,885 sq ft
- Historic district
- Chelsea Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 35 open notices on record for this building, out of 98 notices on file; the most recent was issued Jun 23, 2024.
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
- Failure to
Issued May 2, 2023 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
- Failure to submit
Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
32 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01320412-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01320412-I1
- BBL
- 1007180001
- Postal code
- 10011 · 456 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0