NYC DOB record · Q00528973-B8

42-06 Orchard Street

42-06 Orchard Street, Queens, NY 11101

New building filing in Long Island City-Hunters Point, Queens. The latest DOB status is pending plan examiner assignment.

The filing is waiting for DOB to assign an examiner. Review has not started. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00528973-B8

42-06 Orchard Street

Queens, NY 11101

New building · status dated Sep 22, 2026

Current record
Under review
Proposed scale
69 stories
Dwelling units
824
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00528973-B8 as a new building at 42-06 Orchard Street, Queens, NY 11101. Its latest published status category is Under review, dated Sep 22, 2026. The filing records 69 proposed stories and 824 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Sep 22, 2026
Proposed scale
69 proposed stories and 824 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 4624423Applicant of recordSee the 7 filings that name Perkins Eastman Architects DPC
FiledSep 22, 2026
Current recordUnder review
Proposed scale69 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Erect 69 Story new building. Required parking located on adjacent zoning lot.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 69-story elevator apartment building built in 2022, with 824 homes, on a 20,200 sq ft lot.

Built
2022
Floors
69
Residential units
824
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
M1-5/R9
Lot area
20,200 sq ft
Building area
801,916 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 119 notices on file; the most recent was issued Jan 17, 2011.

  • Elevator

    Issued Jan 17, 2011

  • Local law 10/81 -

    Issued Jan 13, 1997

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00528973-B8.

    01
  2. Current status updated

    The latest recorded filing status is “Pending Plan Examiner Assignment.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 68,520 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00528973-B8
BBL
4002650013
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
69
Existing dwelling units
Empty in the source
Proposed dwelling units
824
General construction