What the filing says
A public-record reading of the proposed work.
Installation and use of temporary construction fence as per plans filed herewith. This application is filed in conjunction with NB Q01045957-I1.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 10-story elevator apartment building built in 2025, with 20 homes, on a 4,631 sq ft lot.
- Built
- 2025
- Floors
- 10
- Residential units
- 20
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- M1-5/R7-3
- Lot area
- 4,631 sq ft
- Building area
- 37,706 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 4 notices on file; the most recent was issued May 13, 2009.
- Construction
Issued May 13, 2009 — DOB APPROVED AROMITECTURAL, STRUCTURAL AND EXCAVATION/SUPPORT OF EXCAVATION PLANS NOT ON SITE AT TIME OF INSPECTION. STOP ALL WORK REMEDY: SUBMIT ALL CONSTRUCTION DOCUMENTS TO SEPEX FOR ENG REVIEW
- Construction
Issued Jan 29, 2009 — MISCELLANEOUS VIOLATIONS FAILURE TO PRESERVE AND PROTECT ADJOINING STR UCTURE AFFECTED BY EXCAVATION OPERATIONS THERE IS AN 8FT TO 10FT SHEER CUT @ EXPOSURE 3 THE STRUCTURAL STABILITY IS UNSAFE 42-76 HUNTER STRE ET IS THE 402506542NB ADJOINING PROPERTY REMEDY: STOP ALL WORK! COMPLY WITH NOTICE OF VIOLATION PROVIDE PROPER
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01150198-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01150198-I1
- BBL
- 4004310006
- Postal code
- 11101 · 517 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1