What the filing says
A public-record reading of the proposed work.
Install temporary shoring at cellar, first, second and third floors. no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story two-family home built in 1930, on a 6,000 sq ft lot.
- Built
- 1930
- Floors
- 3
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R3-1
- Lot area
- 6,000 sq ft
- Building area
- 1,908 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 2 notices on file; the most recent was issued Oct 28, 2025.
- Construction
Issued Oct 28, 2025 — ATOI OBSERVED AT SECOND FLOOR EXP 1. WALL REMOVED AND REPLACED BY A STEEL BEAM. SIZE OF BEAM, BEARING SUPPORT AT WALLS AND FOUNDATION UNKNOWN. NO VISIABLE CONNECTIONS TO WOOD POSTS. SEVERE BOWING OF FLOOR AT STAIR HEADER. ALSO BEARING WALLS AT STAIRS RESTING ON WOOD BLOCKS AND NOT FULL BEARING.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01437767-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01437767-I1
- BIN
- 5016039
- BBL
- 5006220086
- Postal code
- 10304 · 106 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








