NYC DOB record · S00612758-I1

422 St Marks Place

422 St Marks Place, Staten Island, NY 10301

New building filing in St. George-New Brighton, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 27, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S00612758-I1

422 St Marks Place

Staten Island, NY 10301

New building · status dated Oct 23, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
5
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S00612758-I1 as a new building at 422 St Marks Place, Staten Island, NY 10301. Its latest published status category is Approved, dated Oct 23, 2026. The filing records 4 proposed stories and 5 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 23, 2026
Proposed scale
4 proposed stories and 5 proposed dwelling units
The building, not the filingopen housing violations, apartment sizes, the owner of record and every filing at BIN 5177812Applicant of recordSee the 78 filings that name Michael Deruvo & ASSOC. Architects
FiledDec 16, 2021
Current recordApproved
Proposed scale4 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

New building application consisting of first floor commercial space with cellar storage and 5 apartments from the second floor to the fourth floor

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story mainly residential with some commercial built in 2023, with 5 homes, on a 2,077 sq ft lot.

Built
2023
Floors
4
Residential units
5
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
C4-2
Lot area
2,077 sq ft
Building area
4,294 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S00612758-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,269 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S00612758-I1
BBL
5000160117
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
5
General constructionStructural workFoundation workEarthwork