NYC DOB record · S00612758-S1

422 St Marks Place

422 St Marks Place, Staten Island, NY 10301

New building filing in St. George-New Brighton, Staten Island. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S00612758-S1

422 St Marks Place

Staten Island, NY 10301

New building · status dated Oct 5, 2026

Current record
Recorded as completed
Proposed scale
4 stories
Dwelling units
5
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S00612758-S1 as a new building at 422 St Marks Place, Staten Island, NY 10301. Its latest published status category is Recorded as completed, dated Oct 5, 2026. The filing records 4 proposed stories and 5 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
Oct 5, 2026
Proposed scale
4 proposed stories and 5 proposed dwelling units
Applicant of recordSee the 65 filings that name Michael Deruvo & ASSOC. Architects
FiledAug 25, 2023
Current recordRecorded as completed
Proposed scale4 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

New building application consisting of first floor commercial space with cellar storage and 5 apartments from the second floor to the fourth floor, this is a structural plan subsequent filing for s00612758

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story mainly residential with some commercial built in 2023, with 5 homes, on a 2,077 sq ft lot.

Built
2023
Floors
4
Residential units
5
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
C4-2
Lot area
2,077 sq ft
Building area
4,294 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S00612758-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S00612758-S1
BIN
5177812
BBL
5000160117
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
5
General constructionStructural workFoundation workEarthwork