NYC DOB record · B01434257-I1

423 Autumn Avenue

423 Autumn Avenue, Brooklyn, NY 11208

New building filing in East New York-City Line, Brooklyn. The latest DOB status is objections.

The examiner raised objections. The applicant has to resolve them before the filing can be approved. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01434257-I1

423 Autumn Avenue

Brooklyn, NY 11208

New building · status dated Sep 23, 2026

Current record
Under review
Proposed scale
3 stories
Dwelling units
5
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01434257-I1 as a new building at 423 Autumn Avenue, Brooklyn, NY 11208. Its latest published status category is Under review, dated Sep 23, 2026. The filing records 3 proposed stories and 5 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Sep 23, 2026
Proposed scale
3 proposed stories and 5 proposed dwelling units
Applicant of recordSee the 227 filings that name Gerald Caliendo Architects
FiledJul 22, 2026
Current recordUnder review
Proposed scale3 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

New three (3) story five family semi-attached dwelling.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01434257-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Objections.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01434257-I1
BIN
3430491
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
3
Existing dwelling units
Empty in the source
Proposed dwelling units
5
General construction