NYC DOB record · B00614338-P5

424 Carroll Street

424 Carroll Street, Brooklyn, NY 11215

New building filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00614338-P5

424 Carroll Street

Brooklyn, NY 11215

New building · status dated Apr 30, 2023

Current record
Approved
Proposed scale
21 stories
Dwelling units
360
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00614338-P5 as a new building at 424 Carroll Street, Brooklyn, NY 11215. Its latest published status category is Approved, dated Apr 30, 2023. The filing records 21 proposed stories and 360 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Apr 30, 2023
Proposed scale
21 proposed stories and 360 proposed dwelling units
The building, not the filingEvery filing at BIN 3429585, with the parcel and violation recordApplicant of recordSee the 17 filings that name Fxcollaborative Architects LLP
FiledApr 27, 2023
Current recordApproved
Proposed scale21 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Development hub. this job to be filed with the development hub. initial consultation occurred on september 27,2021. erect 21 story (16 stories in east tower , 21 stories in west tower) mixed use new building.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 21-story elevator apartment building built in 2022, with 360 homes, on a 65,376 sq ft lot.

Built
2022
Last altered
2022
Floors
21
Residential units
360
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
M1-4/R7-2
Lot area
65,376 sq ft
Building area
380,071 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 28 notices on file; the most recent was issued Apr 21, 2011.

  • Elevator

    Issued Apr 21, 2011

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00614338-P5.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00614338-P5
BBL
3004530001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
21
Existing dwelling units
Empty in the source
Proposed dwelling units
360
General construction