NYC DOB record · Q08034322-P3

43-09 108 Street

43-09 108 Street, Queens, NY 11368

New building filing in Corona, Queens. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q08034322-P3

43-09 108 Street

Queens, NY 11368

New building · status dated Sep 4, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
7
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q08034322-P3 as a new building at 43-09 108 Street, Queens, NY 11368. Its latest published status category is Approved, dated Sep 4, 2026. The filing records 4 proposed stories and 7 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 4, 2026
Proposed scale
4 proposed stories and 7 proposed dwelling units
The building, not the filingEvery filing at BIN 4595042, with the parcel and violation recordApplicant of recordSee the 19 filings that name Louis Kong Architecture LLC
FiledSep 2, 2026
Current recordApproved
Proposed scale4 stories
Recorded cost$136,000

What the filing says

A public-record reading of the proposed work.

File pl & sp worktype in conjunction with nb job#q08034322

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 2025, with 7 homes, on a 2,500 sq ft lot.

Built
2025
Last altered
2025
Floors
4
Residential units
7
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6B
Lot area
2,500 sq ft
Building area
5,551 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Apr 7, 2026.

  • Construction

    Issued Apr 7, 2026 — FAILURE TO PERFORM SPECIAL INSPECTION DUTIES. REMEDY:SIA TO ADDRESS ALL OBJECTIONS RAISED BY CEU ON 8/11/2025 AND TO SUBMIT UPDATED SI REPORTS FOR BOTH STRUCTURAL STEEL AND CMU CONSTRUCTION NO LATER THAN 4/21/2026

  • Construction

    Issued Apr 7, 2026 — FAILURE TO PROVIDE DETAILED STRUCTURAL INFORMATION:NON-CONFORMING STRUCTAL CONDITIONS ON SITE. STRUCTURAL MEMBERS WERE FOUND TO BE UN- CLEARLY SPECIFIED IN ACCORDANCE WITH NYC BLDG CODE.AS-BUILT COND NOT CONFORMED TO DRAWINGS.EOR TO ADDRESS ALL STRUCTURAL OBJECTIONS RAISED CEU ON 8/22 SUBMIT CONFORMED STRUCTURAL DRAWINGS NO LATER THAN 4/21/26

  • Construction

    Issued Jul 28, 2025 — NB #Q08034322-I1 UNDER CEU AUDIT; REQUESTED STRUCTURAL.DOCUMENTS REMAIN UNSUBMITTED SINCE 05/30/2025 DEADLINE REMEDY: COMPLY WITH CODE. SUBMIT THE REQUESTED DOCUMENTS NO LATER THAN 8/8/2025

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q08034322-P3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q08034322-P3
BBL
4019990069
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
7
plumbingsprinkler