NYC DOB record · M01236871-P6

43 East 70 Street

43 East 70 Street, Manhattan, NY 10021

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 4, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01236871-P6

43 East 70 Street

Manhattan, NY 10021

Alteration filing · status dated Oct 1, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01236871-P6 as a alteration filing at 43 East 70 Street, Manhattan, NY 10021. Its latest published status category is Approved, dated Oct 1, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 1, 2026
Proposed scale
1 proposed dwelling unit
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 1041330Applicant of recordSee the 371 filings that name Tohfaz Uddin PE PC
FiledSep 29, 2026
Current recordApproved
Proposed scale1 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the sf from the top of the sh and the penthouse terrace past the main roof wall, around the bulkhead, setback w, e wall, and north elevation from the ground.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01236871-P6.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,295 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01236871-P6
BBL
1013850028
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1
Scaffolding