NYC DOB record · M01158582-I1

430 East 58 Street

430 East 58 Street, Manhattan, NY 10022

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is on hold - pending supersede of applicant of record.

The filing is paused until an administrative step is completed. It has not been rejected. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 15, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01158582-I1

430 East 58 Street

Manhattan, NY 10022

Alteration filing · status dated Sep 12, 2026

Current record
Under review
Proposed scale
65 stories
Dwelling units
121
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01158582-I1 as a alteration filing at 430 East 58 Street, Manhattan, NY 10022. Its latest published status category is Under review, dated Sep 12, 2026. The filing records 65 proposed stories and 121 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 12, 2026
Proposed scale
65 proposed stories and 121 proposed dwelling units
Applicant of recordSee the 9 filings that name World Design Architecture,pllc
FiledDec 30, 2024
Current recordUnder review
Proposed scale65 stories
Recorded cost$25,000

What the filing says

A public-record reading of the proposed work.

Filing for interior work as per plans

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 11 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01158582-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “On Hold - Pending Supersede of Applicant of Record.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01158582-I1
BIN
1090365
BBL
1013690034
Review type
Standard Plan Examination
Existing stories
65
Proposed stories
65
Existing dwelling units
121
Proposed dwelling units
121
General construction