What the filing says
A public-record reading of the proposed work.
Renovation of the partially fire damaged of the second floor rear bedroom. New drywalls, interior doors, ceiling and windows in the basement. New drywalls, interior doors, wooden floors, ceiling and new windows on the second floor. New interior lighting.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1910, on a 2,000 sq ft lot.
- Built
- 1910
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R6
- Lot area
- 2,000 sq ft
- Building area
- 2,120 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Apr 15, 2023.
- Structurally compromised
Issued Apr 15, 2023 — FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE
- Construction
Issued Feb 21, 2023 — PREMISES NON COMPLIANT DUE TO FIRE CAUSING GAMAGE TO THE 2ND FLOOR, RO OF OPEN, DAMAGE TO DOORS, WINDOWS, WALLS DUE TO FIRE AND FIRE FIGHTING OPERATIONS RENDERING THE PREMISES NON COMPLAIN AT TIME OF INSPECTION
- Construction
Issued Feb 21, 2023 — FTM.2ND FL WAS DMGD W/INTERIOR CEILING CLLPSD&DEBRIS THROUGHOUT PREDOMINATELY@THE REAR HALF OF BLDG.INT PARTITION WALLS MINOR/MOD.FIRE DMGE.EXP1&3 2NDFL WNDWS BRKN&BOARDED.ROOF SKYLGHT BRKN.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB STRT WRK UNDR PRMT BY 4/3/23&COMPLTE/SIGN OFF JOB BY 5/12/23
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00928717-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00928717-I1
- BBL
- 3048090058
- Postal code
- 11225 · 1580 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 2