What the filing says
A public-record reading of the proposed work.
Application to file all plumbing work in conjunction with alt. 1 application # 520385896.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 2021, on a 4,626 sq ft lot.
- Built
- 2021
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R3A
- Lot area
- 4,626 sq ft
- Building area
- 2,468 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Apr 21, 2023.
- Construction
Issued Apr 21, 2023 — DUE TO THE WITHDRAWAL OF THE GENERAL CONTRACTOR OF RECORD, THE BOROUGH COMMISSIONER S OFFICE HAS ORDERED ALL WORK UNDER JOB # 520385896 STOPPED ON 04/21/23 UNTIL A NEW CONTRACTOR IS IN PLACE, AS PER 28-207.2, NYC-ADMINISTRATIVE CODE. STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE.
- Construction
Issued Apr 21, 2023 — DUE TO THE WITHDRAWAL OF THE GENERAL CONTRACTOR OF RECORD, THE BOROUGH COMMISSIONER S OFFICE HAS ORDERED ALL WORK UNDER JOB # 520385896 STOPPED ON 04/21/23 UNTIL A NEW CONTRACTOR IS IN PLACE, AS PER 28-207.2, NYC-ADMINISTRATIVE CODE. STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S00206655-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,082 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S00206655-I1
- BIN
- 5174422
- BBL
- 5002230009
- Postal code
- 10310 · 84 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








