What the filing says
A public-record reading of the proposed work.
Installation of new air-conditioning split system within elevator machine equipment room
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story condominium built in 2007, with 11 homes, on a 6,554 sq ft lot.
- Built
- 2007
- Floors
- 7
- Residential units
- 11
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- R8B
- Lot area
- 6,554 sq ft
- Building area
- 28,375 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 16 notices on file; the most recent was issued Jul 28, 2022.
- Construction
Issued Jul 28, 2022 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION EXTERIOR WINDOW ENCLOSURE BOARD, WOOD & METAL FRAMING DEBRIS FALLING ON TO BACK PATIO FROM ADJACENT BUILDING ( 414 E 75 STREET ) AT 433 E 74 STREET MANHATTAN. A PARTIAL VACATE ORDER ISSUED 15'-0" FROM THE DEFECTIVE BUILDING WALL.
- Elevator
Issued Sep 9, 2019
- Construction
Issued Feb 21, 2019 — AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO PARAPET WALL OF ADJACENT BUILDING ( 435 EAST 74TH STREET) DUE TO DISREPAIR PARAPET WALL TILTING OVER THE BACK YARD AT 133 EAST 74TH ST A PARTIAL VACATE ORDER ISSUED FOR ENTIRE BACK YARD
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01461395-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 68,520 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01461395-I1
- BIN
- 1045896
- BBL
- 1014697502
- Postal code
- 10021 · 436 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 11
- Proposed dwelling units
- 11








