What the filing says
A public-record reading of the proposed work.
Suspended scaffold out rigger installation for Facade restoration works and inspections.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 13-story elevator apartment building built in 1930, with 69 homes, on a 8,381 sq ft lot.
- Built
- 1930
- Last altered
- 1988
- Floors
- 13
- Residential units
- 69
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7B
- Lot area
- 8,381 sq ft
- Building area
- 63,956 sq ft
- Historic district
- Chelsea Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 49 notices on file; the most recent was issued Jul 9, 2025.
- Plumbing
Issued Jul 9, 2025 — THE DEPARTMENT OF BUILDINGS ORDERS ALL PLUMBING WORK STOP IMMEDIATELY UNDER PERMIT NUMBER 121288775 DUE TO THE INACTIVE LMP # 1343
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
- Failure to submit
Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01213141-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 80,574 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01213141-I1
- BIN
- 1012626
- BBL
- 1007190020
- Postal code
- 10011 · 789 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source