NYC DOB record · B00648659-I1

435 Coney Island Avenue

435 Coney Island Avenue, Brooklyn, NY 11218

New building filing in Flatbush (West)-Ditmas Park-Parkville, Brooklyn. The latest DOB status is co issued.

A Certificate of Occupancy has been issued, which is what makes a space legal to occupy. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00648659-I1

435 Coney Island Avenue

Brooklyn, NY 11218

New building · status dated Dec 18, 2025

Current record
Recorded as completed
Proposed scale
8 stories
Dwelling units
128
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00648659-I1 as a new building at 435 Coney Island Avenue, Brooklyn, NY 11218. Its latest published status category is Recorded as completed, dated Dec 18, 2025. The filing records 8 proposed stories and 128 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
Dec 18, 2025
Proposed scale
8 proposed stories and 128 proposed dwelling units
The building, not the filingopen housing violations and every filing at BIN 3430130Applicant of recordSee the 27 filings that name Na Design Studio
FiledJan 13, 2022
Current recordRecorded as completed
Proposed scale8 stories
Recorded cost$8.5M

What the filing says

A public-record reading of the proposed work.

New 8 story, mixed use commercial and multi-family quality housing residential building with 128dwelling units including 20% affordable and accessory parking (a min. of 20% of floor area to bedesignated towards affordable units)

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story elevator apartment building built in 2023, with 128 homes, on a 21,390 sq ft lot.

Built
2023
Last altered
2022
Floors
8
Residential units
128
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
21,390 sq ft
Building area
110,375 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00648659-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “CO Issued.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00648659-I1
BBL
3050700019
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
8
Existing dwelling units
Empty in the source
Proposed dwelling units
128
General construction