NYC DOB record · B00337285-P1

437 Euclid Avenue

437 Euclid Avenue, Brooklyn, NY 11208

Alteration filing in East New York-City Line, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00337285-P1

437 Euclid Avenue

Brooklyn, NY 11208

Alteration filing · status dated Nov 13, 2023

Current record
Approved
Proposed scale
8 stories
Dwelling units
135
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00337285-P1 as a alteration filing at 437 Euclid Avenue, Brooklyn, NY 11208. Its latest published status category is Approved, dated Nov 13, 2023. The filing records 8 proposed stories and 135 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 13, 2023
Proposed scale
8 proposed stories and 135 proposed dwelling units
Complete building dossierView all 7 filings associated with BIN 3428526Applicant of recordSee the 151 filings that name Skyline Engineering, LLC
FiledNov 2, 2023
Current recordApproved
Proposed scale8 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Propose to install (2) dual fuel gas boiler as per plan filed in conjunction with nb # 321594226

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00337285-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00337285-P1
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
8
Proposed stories
8
Existing dwelling units
135
Proposed dwelling units
135