44 Victory Boulevard

44 Victory Boulevard, Staten Island, NY 10301

Alteration filing in Tompkinsville-Stapleton-Clifton-Fox Hills, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01071542-I1

44 Victory Boulevard

Staten Island, NY 10301

Alteration filing · status dated Oct 19, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
200
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01071542-I1 as a alteration filing at 44 Victory Boulevard, Staten Island, NY 10301. Its latest published status category is Approved, dated Oct 19, 2026. The filing records 200 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 19, 2026
Proposed scale
200 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 5176385Applicant of recordSee the 37 filings that name Bohler Engineering
FiledJul 3, 2024
Current recordApproved
Proposed scale200 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Curb Cut 2: Easterly side of Van Duzer Street 240.20' south of Victory Boulevard. Thence south along Van Duzer Street 26 feet constructing a 21-foot curb cut and two (2) 2.5-foot splays as per NYCDOT H-1015.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01071542-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,982 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01071542-I1
BBL
5004980040
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
200
Proposed dwelling units
200