What the filing says
A public-record reading of the proposed work.
Installation of temporary fence as per plans. temporary fence shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story health facility built in 1930, on a 891,577 sq ft lot.
- Built
- 1930
- Last altered
- 2006
- Floors
- 5
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R5
- Lot area
- 891,577 sq ft
- Building area
- 1,503,150 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 39 notices on file; the most recent was issued Oct 11, 2023.
- Hazardous condition (facade)
Issued Oct 11, 2023 — CYCLE 9A UNSAFE REPORT FILED
- Construction
Issued Oct 8, 2019 — STOP ALL WORK, IMMEDIATELY AND MAKE SITE SAFE CONTACT THE BOROUGH COMMISSIONER'S OFFICE AT 718 802-3677
- Construction
Issued Oct 8, 2019 — STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE CONTACT THE BOROUGJH COMM ISSIONER'S OFFICE AT 718 802-3677
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00379197-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00379197-I1
- BBL
- 3048290001
- Postal code
- 11203 · 1302 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0