What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the NYC code 2022, no changes in use egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story two-family home built in 1899, on a 1,480 sq ft lot.
- Built
- 1899
- Floors
- 3
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R6A
- Lot area
- 1,480 sq ft
- Building area
- 2,880 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Jan 20, 2022.
- Construction
Issued Jan 20, 2022 — FTM-BLDG ADJ LOT DEMO UNDER JOB#321986605.PER DOB BOROUGH ENFORCMNT INSPCTN 01/20/2022,EXP2(EAST) MISSNG WATRPROOFNG &EXPOSD TOELMNTS.OPN PRMT WATRPROOFNG INSTLL UNDR JOB#340771436 SINCE 11/17/20 IMMEDIATELY WATERPROOF EXPOSURE 2 WALL UNDER PERMIT
- Fail to certify class
Issued Sep 19, 2018 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01463976-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01463976-I1
- BIN
- 3055637
- BBL
- 3019490038
- Postal code
- 11238 · 2876 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2