NYC DOB record · Q01452285-I1

45-49 Vernon Boulevard

45-49 Vernon Boulevard, Queens, NY 11101

Alteration filing in Long Island City-Hunters Point, Queens. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 9, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01452285-I1

45-49 Vernon Boulevard

Queens, NY 11101

Alteration filing · status dated Sep 3, 2026

Current record
Under review
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01452285-I1 as a alteration filing at 45-49 Vernon Boulevard, Queens, NY 11101. Its latest published status category is Under review, dated Sep 3, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 3, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 26 filings that name Kao Hwa Lee Architects PC
FiledSep 2, 2026
Current recordUnder review
Proposed scaleNot specified
Recorded cost$125,000

What the filing says

A public-record reading of the proposed work.

Builder's Pavement Plan for NB Q01425663-I1, filed in-conjunction with BP job number Q01452286-I1 for NB Q01425664-I1.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a garage or fuel station on a 12,500 sq ft lot.

Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
M1-3A/R7A
Lot area
12,500 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01452285-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01452285-I1
BIN
4626168
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source