45 Gramercy Park North

45 Gramercy Park North, Manhattan, NY 10010

Alteration filing in Gramercy, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01176904-I1

45 Gramercy Park North

Manhattan, NY 10010

Alteration filing · status dated Oct 14, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
5
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01176904-I1 as a alteration filing at 45 Gramercy Park North, Manhattan, NY 10010. Its latest published status category is Recorded as completed, dated Oct 14, 2026. The filing records 5 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 14, 2026
Proposed scale
5 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1017993Applicant of recordSee the 49 filings that name Rimkus
FiledMar 13, 2025
Current recordRecorded as completed
Proposed scale5 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

INSTALLATION OF HEAVY DUTY SIDEWALK SHED and pipe scaffolding. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 14-story elevator apartment building built in 1927, with 40 homes, on a 7,702 sq ft lot.

Built
1927
Last altered
2011
Floors
14
Residential units
40
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R9A
Lot area
7,702 sq ft
Building area
78,382 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 21 notices on file; the most recent was issued Feb 22, 2023.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • (other bldgs types) - elevator affirmation of

    Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

  • (other bldgs types) - elevator affirmation of

    Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01176904-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01176904-I1
BBL
1008770026
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
5
Proposed dwelling units
5
Sidewalk shedScaffolding