What the filing says
A public-record reading of the proposed work.
Herewith filing for plumbing fixtures modification in apt. 20g as per plans filed herewith. no change in use, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story elevator apartment building built in 1958, with 278 homes, on a 30,463 sq ft lot.
- Built
- 1958
- Floors
- 20
- Residential units
- 278
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10
- Lot area
- 30,463 sq ft
- Building area
- 510,547 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 46 notices on file; the most recent was issued Jul 18, 2024.
- Construction
Issued Jul 18, 2024 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION # 123123618 DUE TO APPLICANT WITHDRAWAL. AT THE TIME OF INSPECTION, WORK IS 100 PERCENT COMPLETED. STOP ALL WORK FOR JOB # ONLY AND MAKE SITE SAFE.
- Elevator
Issued Sep 21, 2023 — ELEVATOR IS SHUT DOWN DUE TO FIRE AND WATER DAMAGE.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01357250-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01357250-S1
- BBL
- 1013710014
- Postal code
- 10022 · 420 filings
- Review type
- Standard Plan Examination
- Existing stories
- 20
- Proposed stories
- 20
- Existing dwelling units
- 274
- Proposed dwelling units
- 274