What the filing says
A public-record reading of the proposed work.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story elevator apartment building built in 1926, with 104 homes, on a 30,282 sq ft lot.
- Built
- 1926
- Last altered
- 1986
- Floors
- 8
- Residential units
- 104
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7A
- Lot area
- 30,282 sq ft
- Building area
- 53,835 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 54 notices on file; the most recent was issued May 5, 2026.
- Construction
Issued May 5, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT TIME OF INSPECTION,I OBSERVED AT EXP1,CRACKS IN TERRACOTTA WATER TABLE ON T HE 8TH FLOOR.EXP2:CRACKS IN EYEBROW/WINDOW SILL ON 3RD FLOOR.EXP4 WEST ELEV:MISSING/SPALLING BRICKS ON THE 6TH,7TH,AND 9TH FLOORS.LOSE METAL CAPPING ON PARAPET.REMEDY:REPAIR AND/OR REPLACE ALL DAMAGES ON FACADE
- Construction
Issued May 5, 2026 — EMERGENCY WORK ORDER DUE TO BULGING BRICKS,SPALLING & MISSING MORTAR JOINTS BENEATH COPING STONE @ PARAPET AT EXPOSURE #4 SOUTH FACING WALL PARAPET. ALSO LOOSE METAL CAPPING AT THE SAME BUILDING BRICK WALL REMEDY: TAKE SECURE/PROVIDE SAFETY MEASURES TO SECURE PUBLIC SAFETY & EXP4 SOUTH FACING PARAPET WALL
- Fail to certify class
Issued Nov 26, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01411004-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01411004-I1
- BIN
- 1084106
- BBL
- 1019700016
- Postal code
- 10027 · 241 filings
- Review type
- Professional Certification
- Existing stories
- 8
- Proposed stories
- 8
- Existing dwelling units
- 80
- Proposed dwelling units
- 80