NYC DOB record · M01411004-I1

450 West 131 Street

450 West 131 Street, Manhattan, NY 10027

Alteration filing in Manhattanville-West Harlem, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01411004-I1

450 West 131 Street

Manhattan, NY 10027

Alteration filing · status dated Aug 26, 2026

Current record
Approved
Proposed scale
8 stories
Dwelling units
80
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01411004-I1 as a alteration filing at 450 West 131 Street, Manhattan, NY 10027. Its latest published status category is Approved, dated Aug 26, 2026. The filing records 8 proposed stories and 80 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 26, 2026
Proposed scale
8 proposed stories and 80 proposed dwelling units
FiledAug 26, 2026
Current recordApproved
Proposed scale8 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story elevator apartment building built in 1926, with 104 homes, on a 30,282 sq ft lot.

Built
1926
Last altered
1986
Floors
8
Residential units
104
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7A
Lot area
30,282 sq ft
Building area
53,835 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 54 notices on file; the most recent was issued May 5, 2026.

  • Construction

    Issued May 5, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT TIME OF INSPECTION,I OBSERVED AT EXP1,CRACKS IN TERRACOTTA WATER TABLE ON T HE 8TH FLOOR.EXP2:CRACKS IN EYEBROW/WINDOW SILL ON 3RD FLOOR.EXP4 WEST ELEV:MISSING/SPALLING BRICKS ON THE 6TH,7TH,AND 9TH FLOORS.LOSE METAL CAPPING ON PARAPET.REMEDY:REPAIR AND/OR REPLACE ALL DAMAGES ON FACADE

  • Construction

    Issued May 5, 2026 — EMERGENCY WORK ORDER DUE TO BULGING BRICKS,SPALLING & MISSING MORTAR JOINTS BENEATH COPING STONE @ PARAPET AT EXPOSURE #4 SOUTH FACING WALL PARAPET. ALSO LOOSE METAL CAPPING AT THE SAME BUILDING BRICK WALL REMEDY: TAKE SECURE/PROVIDE SAFETY MEASURES TO SECURE PUBLIC SAFETY & EXP4 SOUTH FACING PARAPET WALL

  • Fail to certify class

    Issued Nov 26, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01411004-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01411004-I1
BIN
1084106
BBL
1019700016
Review type
Professional Certification
Existing stories
8
Proposed stories
8
Existing dwelling units
80
Proposed dwelling units
80
Sidewalk shed