What the filing says
A public-record reading of the proposed work.
New non-freeze wall hydrant in storage room 100, revised fresh air inlet, new area drains at exterior street level and stair landing at mez level, new scupper with drainage at elevator roof. Related work at High Line filed under M01320837-S3.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 24-story condominium built in 2006, with 469 homes, on a 52,900 sq ft lot.
- Built
- 2006
- Floors
- 24
- Residential units
- 469
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-3
- Lot area
- 52,900 sq ft
- Building area
- 504,210 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 72 notices on file; the most recent was issued Jan 6, 2018.
- Plumbing
Issued Jan 6, 2018 — THE BOROUGH COMMISSIONER HAS ISSUED A NOTICE TO REVOKE APPLICATION #14 0428311 DUE TO REVOCATION OF THE MASTER PLUMBERS LICENSE #1350.STOP AL L WORK IN CONNECTION WITH THIS APPLICATION IMMEDIATELY
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01334037-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01334037-S2
- BBL
- 1007147501
- Postal code
- 10011 · 625 filings
- Review type
- Standard Plan Examination
- Existing stories
- 24
- Proposed stories
- 24
- Existing dwelling units
- 478
- Proposed dwelling units
- 478