What the filing says
A public-record reading of the proposed work.
Interior Renovations of apt 12A. Apartment renovation from 3 bedroom to a 2 bedroom unit. Work includes but not limited to non-bearing partition modification & finishes as per plan. No change in use, egress or occupancy. Plumbing work filed under LAA
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 25-story condominium built in 2002, with 100 homes, on a 42,586 sq ft lot.
- Built
- 2002
- Floors
- 25
- Residential units
- 100
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 42,586 sq ft
- Building area
- 214,360 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 130 notices on file; the most recent was issued Mar 28, 2024.
- Construction
Issued Mar 28, 2024 — EMERCENCY WORK ORDER;CELLAR,SUB CELLAR LEVEL CRACK ON CEILING/SPALLING CONCRETE/EXPOSE REBAR VISIBLE WATER PENETRATION SEVERAL LOC.IMMED.HAZ REMEDY:RETAIN NYS REG.DESIGN PROF.TO DIRECT&SUPERV.INSTALLATION OF SAFETY MEASURES.ALL WORK TO BE CONDUCTED UNDER FULL SUPERV.OF NYS RDP .PROVIDE PROGRESS REORTS TO PARKINGSTRUCTURE@BUILDINGS.NYC.GOV
- Construction
Issued Jun 16, 1997
- Local law 10/81 -
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01346366-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01346366-I1
- BBL
- 1018417503
- Postal code
- 10025 · 304 filings
- Review type
- Professional Certification
- Existing stories
- 25
- Proposed stories
- 25
- Existing dwelling units
- 99
- Proposed dwelling units
- 99








