NYC DOB record · X01357937-S9

4572 Manhattan College Parkway

4572 Manhattan College Parkway, Bronx, NY 10471

New building filing in Kingsbridge-Marble Hill, Bronx. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01357937-S9

4572 Manhattan College Parkway

Bronx, NY 10471

New building · status dated Aug 26, 2026

Current record
Under review
Proposed scale
5 stories
Dwelling units
16
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01357937-S9 as a new building at 4572 Manhattan College Parkway, Bronx, NY 10471. Its latest published status category is Under review, dated Aug 26, 2026. The filing records 5 proposed stories and 16 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Aug 26, 2026
Proposed scale
5 proposed stories and 16 proposed dwelling units
Complete building dossierView all 6 filings associated with BIN 2130669
FiledAug 24, 2026
Current recordUnder review
Proposed scale5 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Underpinning design

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a vacant land on a 6,625 sq ft lot.

Last altered
2019
Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
R6
Lot area
6,625 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01357937-S9.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01357937-S9
BBL
2057760609
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
5
Existing dwelling units
Empty in the source
Proposed dwelling units
16
Foundation workEarthwork