NYC DOB record · B01419922-S1

458 Neptune Avenue

458 Neptune Avenue, Brooklyn, NY 11224

Alteration filing in Coney Island-Sea Gate, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01419922-S1

458 Neptune Avenue

Brooklyn, NY 11224

Alteration filing · status dated Sep 22, 2026

Current record
Approved
Proposed scale
23 stories
Dwelling units
572
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01419922-S1 as a alteration filing at 458 Neptune Avenue, Brooklyn, NY 11224. Its latest published status category is Approved, dated Sep 22, 2026. The filing records 23 proposed stories and 572 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 22, 2026
Proposed scale
23 proposed stories and 572 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 3196580Applicant of recordSee the 89 filings that name Christopher Teeter
FiledJun 29, 2026
Current recordApproved
Proposed scale23 stories
Recorded cost$8,000

What the filing says

A public-record reading of the proposed work.

Apartment 5j proposed renovation of an existing bathroom as shown on the submitted drawings. this app does not require a new or amended cert. of occupancy as there is no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 23-story elevator apartment building built in 1964, with 572 homes, on a 189,008 sq ft lot.

Built
1964
Floors
23
Residential units
572
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
189,008 sq ft
Building area
623,800 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 124 notices on file; the most recent was issued Feb 20, 2020.

  • Construction

    Issued Feb 20, 2020 — STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE ONLY/CONTACT THE BOROUGH COMMISSIONER OFFICE AT 718 802-3677 WITH APPROPIATE INFORMATION

  • Construction

    Issued Feb 20, 2020 — STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE ONLY CONTACT THE BOROUGH COMMISSIONER'S OFFICE AT 718 802-3677 WITH APPROPIATE INFORMATION

  • Construction

    Issued Feb 20, 2020 — STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE ONLY. CONTACT THE BOROUGH COMMISSIONER'S OFFICE AT 718 802-3677 WITH APPROPIATE INFORMAT ION

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01419922-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,295 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01419922-S1
BBL
3072740001
Review type
Standard Plan Examination
Existing stories
23
Proposed stories
23
Existing dwelling units
572
Proposed dwelling units
572