What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1906, with 14 homes, on a 1,799 sq ft lot.
- Built
- 1906
- Floors
- 4
- Residential units
- 14
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6A
- Lot area
- 1,799 sq ft
- Building area
- 4,863 sq ft
- Historic district
- Hamilton Heights Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 7 notices on file; the most recent was issued Sep 6, 2019.
- Construction
Issued Sep 6, 2019 — FTM:BLDG IN EXTREME STATE OF DISREP.OPEN JOINTS,LOOSE BRICKS.MULTIPLE OPEN HOLES IN ROOF&ROTTED SHEATHING&FRAMG @REAR EXTN ROOF.DETERIOR SUB FLR&FRAMG IN MULTI LOCAT ON ALL LEVELS.PART COLLAP OF FLRS 1-4 ATREAR CMPL BLDG REPRS UNDER PRMT.FILE FOR PERM REPRS/BLDG RENO BY 6/1/2020 OBT PRMT&STRT WRK BY 6/15/2020.CMPL REPRS/RENO & S/O PRMT BY 6/15/2021
- Construction
Issued Sep 6, 2019 — FTM:BLDG IN EXTREME STATE OF DISREP.LOOSE BRICKS@FRNT PARAPET.EXP 2&3 WALLS OF REAR EXTN HAVE OUTWARD BULGES@4TH FL EXP3.PART COLLAP OF FLRS 1-4 @REAR.OWN HIRE PE EVAL ENTIRE BLDG PROVIDE NEW ROOF STRUCT&ROOF AT REAR EXTN,REPR EXT WALLS&INSTL TEMP SHOR TO STABL BLDG.FILE PERMIT BY 11/11/19.STRT WRK BY 11/25/19.CMPL BLDG STABL&ENVELOPE WRK BY 2/10/20
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00747652-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00747652-I1
- BIN
- 1061200
- BBL
- 1020570036
- Postal code
- 10031 · 126 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 14
- Proposed dwelling units
- 14