NYC DOB record · Q01153968-S4

46-73 54 Road

46-73 54 Road, Queens, NY 11378

New building filing in Sunnyside, Queens. The latest DOB status is permit entire - bc/dbc review.

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01153968-S4

46-73 54 Road

Queens, NY 11378

New building · status dated Sep 22, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01153968-S4 as a new building at 46-73 54 Road, Queens, NY 11378. Its latest published status category is Approved, dated Sep 22, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 22, 2026
Proposed scale
1 proposed story
The building, not the filingEvery filing at BIN 4625383, with the parcel and violation recordApplicant of recordSee the 46 filings that name Aecom
FiledJun 13, 2025
Current recordApproved
Proposed scale1 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Structural for an electric vehicle charging facility

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story garage or fuel station built in 1983, on a 37,250 sq ft lot.

Built
1983
Floors
1
Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
M2-1
Lot area
37,250 sq ft
Building area
600 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01153968-S4.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire - BC/DBC Review.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01153968-S4
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
1
Existing dwelling units
Empty in the source
Proposed dwelling units
0
Structural work