NYC DOB record · B01452374-I1

461 46 Street

461 46 Street, Brooklyn, NY 11220

Alteration filing in Sunset Park (West), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01452374-I1

461 46 Street

Brooklyn, NY 11220

Alteration filing · status dated Aug 28, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
21
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01452374-I1 as a alteration filing at 461 46 Street, Brooklyn, NY 11220. Its latest published status category is Approved, dated Aug 28, 2026. The filing records 21 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 28, 2026
Proposed scale
21 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3011569Applicant of recordSee the 203 filings that name Mchenery Testing Lab
FiledAug 27, 2026
Current recordApproved
Proposed scale21 units
Recorded cost$8,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1912, with 43 homes, on a 10,000 sq ft lot.

Built
1912
Floors
5
Residential units
43
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6B
Lot area
10,000 sq ft
Building area
37,700 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 8 notices on file; the most recent was issued Aug 27, 2026.

  • Immediate

    Issued Aug 27, 2026 — REQUESTING TO INSTALL PEDESTRIAN PROTECTION SIDEWALK SHED APPROXIMATELY 110' LINEAR FT AT EXPOSURE #1 ON (46 STREET) EXTENDING PAST6 5' AT EXPO 2&4 EXTENDING TO COVER 10' FT AT SIDEWALK TO SAFE GUARD PUBLIC AND PROPERTY

  • Construction

    Issued Aug 26, 2026 — REQUEST FOR ENGINEERS REPORT. OBSERVED AT INCIDENT AT EXPOSURE 1 BETWEEN 3 & 4 FLOORS AT WINDOWS SECTION OF BRICKS DISLODGED FROM FA ADE & COLLAPSED TO SIDEWALK BELOW, 5TH FLOOR BELOW WINDOW ALSO ANGLED BRICKS & MISSING SECTIONS OF MORTAR AT OTHER WINDOWS.

  • Failure to

    Issued May 2, 2019 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01452374-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01452374-I1
BBL
3007470048
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
21
Proposed dwelling units
21
Scaffolding