What the filing says
A public-record reading of the proposed work.
Installation walls, doors, ceiling, and floor finishes as per plans for 4th floor only. fire clean up, mechanical, plumbing, and sprinkler filed under separate applications. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 1871, with 8 homes, on a 5,023 sq ft lot.
- Built
- 1871
- Last altered
- 2008
- Floors
- 5
- Residential units
- 8
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- M1-5/R7X
- Lot area
- 5,023 sq ft
- Building area
- 22,207 sq ft
- Historic district
- SoHo-Cast Iron Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 24 notices on file; the most recent was issued Jul 3, 2024.
- Construction
Issued Jul 3, 2024 — FAILURE TO MAINTAIN.MULT LOCATIONS OF PENTHOUSE STEEL FRAMNG CONNECTIONS W/TC BOLTS NOT FULLY TENSIONED.NEW STAIR CONNECTNG ROOF OF 461 TO 463 ROOF FOR ACCESS TO SHARD FIRE ESCAPE ROOF ACCESS NOT CNTRCT 1.NYS RA/APPLICNT OR RECORD&NYSPE/SPECIAL INSPECTR TO IMMED EVAL ALL CNDITIONS@PENTHOUSE&DSGN REMEDIAL WRK
- Construction
Issued Jul 3, 2024 — FAILURE TO MAINTAIN.BLDG SFFRD A 3-ALARM FIRE ON 6/20/24 AT ROOF/PENTHOUSE LEVELS.ENTIRE PENTHOUSE&ELEVATED COMPOSITE WOOD DECKFIRE DMGD.SAGGNG STEEL BEAMS,BROKEN BEAM CONNECTION&MELTD/MSSNG DECKNG.1.NYSPE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 9/16/24,3.OBTN PRMTS&STRT RPAIRS BY 9/30/24
- Construction
Issued Jul 3, 2024 — EMERG WRK BLDG SUFFRD 3 ALRM FIRE ON 6/20/24,ROOF PENTHSE LEVEL ENTIRE PENTHSE,COMPOSITE WOOD DECK-FIRE DMG.ROOF BELOW PENTHSE FRAME FIRE DMG WITH CHARRED ROOF AND JOIST WITH MULTIPLE OPENINGS.IMMED INSTL TEMP ROOF BARRIERS&FRAME &TEMP REAR&ROOF TOP STRT @461 BROOME ST ROOF @ DRCTN OF NYSPE,RPR DMGD'D PARAPET
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01357780-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01357780-I1
- BIN
- 1007034
- BBL
- 1004740010
- Postal code
- 10013 · 1198 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 4
- Proposed dwelling units
- 4








