What the filing says
A public-record reading of the proposed work.
[SCHOOL] Removal and installation of interior partitions and finishes as per plans.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01383210-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01383210-P1
- BBL
- 1021750001
- Postal code
- 10040 · 113 filings
- Review type
- Professional Certification
- Existing stories
- 20
- Proposed stories
- 20
- Existing dwelling units
- 222
- Proposed dwelling units
- 222








