What the filing says
A public-record reading of the proposed work.
File interior renovation in cellar to resolve violations #35446364p & #35446363n. remove 3 pieces bathroom in cellar. no change in egress, use or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1914, with 6 homes, on a 3,250 sq ft lot.
- Built
- 1914
- Floors
- 3
- Residential units
- 6
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 3,250 sq ft
- Building area
- 5,688 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 6 notices on file; the most recent was issued Jan 3, 2008.
- Local law 62/91 - boilers
Issued Jan 3, 2008
- Construction
Issued Sep 9, 1999 — WORK WITHOUT A PERMIT. WORK NOTED: HAVING CUT STREET CUT TO CREAT A DRIVEWAY CUT APPROX. 8 FT. LONG REMEDY
- Construction
Issued Sep 5, 1999 — WORK WITHOUT PERMITS. IN CELLAR ERECTED FULL HEIGHT PARTITIONS CREATIN G AN APARTMENT WITH FULL ELECTRICAL AND PLUMBING SERVICES REMEDY: OBTAIN PERMITS OR RESTORE PREMISES TO PRIOR LEGAL CONDITIONS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00327578-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00327578-I1
- BBL
- 3007090047
- Postal code
- 11232 · 1511 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 7
- Proposed dwelling units
- 7








