NYC DOB record · M01405505-S1

467 Central Park West

467 Central Park West, Manhattan, NY 10025

Alteration filing in Upper West Side-Manhattan Valley, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01405505-S1

467 Central Park West

Manhattan, NY 10025

Alteration filing · status dated Sep 28, 2026

Current record
Approved
Proposed scale
16 stories
Dwelling units
99
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01405505-S1 as a alteration filing at 467 Central Park West, Manhattan, NY 10025. Its latest published status category is Approved, dated Sep 28, 2026. The filing records 16 proposed stories and 99 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 28, 2026
Proposed scale
16 proposed stories and 99 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1075198Applicant of recordSee the 30 filings that name Bchen Architect PLLC
FiledMay 21, 2026
Current recordApproved
Proposed scale16 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Remove and replace (1) toilet, (1) lavatory, (1) kitchen sink, (1) dishwasher and remove existing bathtub to be replace with (1) new shower

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 16-story condominium built in 1929, with 99 homes, on a 10,123 sq ft lot.

Built
1929
Floors
16
Residential units
99
Building type
Condominium
Land use
Elevator apartments
Zoning district
R8
Lot area
10,123 sq ft
Building area
92,525 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01405505-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01405505-S1
BBL
1018427501
Review type
Standard Plan Examination
Existing stories
16
Proposed stories
16
Existing dwelling units
99
Proposed dwelling units
99