NYC DOB record · Q01470578-I1

47-20 Center Boulevard

47-20 Center Boulevard, Queens, NY 11109

Alteration filing in Long Island City-Hunters Point, Queens. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 28, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01470578-I1

47-20 Center Boulevard

Queens, NY 11109

Alteration filing · status dated Oct 26, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
498
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01470578-I1 as a alteration filing at 47-20 Center Boulevard, Queens, NY 11109. Its latest published status category is Approved, dated Oct 26, 2026. The filing records 498 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 26, 2026
Proposed scale
498 proposed dwelling units
Applicant of recordSee the 12 filings that name Marcy Engineering, PLLC
FiledOct 23, 2026
Current recordApproved
Proposed scale498 units
Recorded cost$40,000

What the filing says

A public-record reading of the proposed work.

Direct replacement of (1) 5-ton packaged rooftop unit.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 31-story elevator apartment building built in 2007, with 495 homes, on a 48,199 sq ft lot.

Built
2007
Floors
31
Residential units
495
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
M3-1
Lot area
48,199 sq ft
Building area
477,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 28, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 28, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01470578-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,037 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01470578-I1
BIN
4538318
BBL
4000210070
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
498
Proposed dwelling units
498