NYC DOB record · M01309017-S1

47 East 30 Street

47 East 30 Street, Manhattan, NY 10016

Full demolition filing in Midtown South-Flatiron-Union Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01309017-S1

47 East 30 Street

Manhattan, NY 10016

Full demolition · status dated Aug 25, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01309017-S1 as a full demolition at 47 East 30 Street, Manhattan, NY 10016. Its latest published status category is Approved, dated Aug 25, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Approved
Latest status date
Aug 25, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1016965
FiledMar 3, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$160

What the filing says

A public-record reading of the proposed work.

Use of chute at the time of full demolition in conjunction with the demo application

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story mainly residential with some commercial built in 1915, with 5 homes, on a 2,067 sq ft lot.

Built
1915
Floors
4
Residential units
5
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
C6-4A
Lot area
2,067 sq ft
Building area
5,320 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 13 notices on file; the most recent was issued Oct 11, 2023.

  • Construction

    Issued Oct 11, 2023 — AT TIME OF INSPECTION OBSERVED APPROX. 12" HOLE AND CRACKS ON SIDEWALK CONCRETE THROUGH FRONT VAULT. ALSO OBSERVED I-BEAMS & METAL DECKING FOR SIDEWALK CONCRETE ROTTED, SECTION MISSING, DETERIORATED AND SEVERELY DAMAGED INSIDE THE VAULT & STRUCTURAL STABILITY COMPROMISED.

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01309017-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01309017-S1
BBL
1008600034
Review type
Professional Certification
Existing stories
4
Proposed stories
Empty in the source
Existing dwelling units
5
Proposed dwelling units
Empty in the source