What the filing says
A public-record reading of the proposed work.
Application filed for interior removal of non-load bearing partitions, ceilings and finishes on the 5th floor as per plans filed herewith. no change in use, group, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 14-story office building built in 1915, on a 17,281 sq ft lot.
- Built
- 1915
- Last altered
- 2023
- Floors
- 14
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C2-8
- Lot area
- 17,281 sq ft
- Building area
- 241,508 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 19 open notices on record for this building, out of 95 notices on file; the most recent was issued Feb 17, 2026.
- Construction
Issued Feb 17, 2026 — FAILRE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. OBSERVED DEFECTIVE CONDITIONS AT EXP 2 SOUTH ELEV. CRACKED/SPALLED TERRACOTTA AT 4TH FLR CORNICE SOUTH. CRACKED STONE AT 1ST FLR EAST. ROOF AREA OBSERVED CRACK -ED STONE ON BULKHEAD. REMEDY: REPAIR AND OR REPLACE
- Construction
Issued Aug 22, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT TIME OF INSPECTION,I OBSERVED AT EXP2 SOUTH ELEV,CRACKS AT TERRA COTTA AT GARA GE ENTRANCE.ALSO LOOSE METAL PANEL AT HEADER HEIGHT.REMEDY:REPAIR AND/ OR REPLACE
- Construction
Issued Nov 26, 2024 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO 1X VERTICAL UPRIGHT ON SIDE WALK SHED DUE TO VEHICLE IMPACT.
16 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01444423-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01444423-I1
- BBL
- 1007080031
- Postal code
- 10018 · 267 filings
- Review type
- Professional Certification
- Existing stories
- 14
- Proposed stories
- 14
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








