NYC DOB record · B00643705-S4

475 Smith Street

475 Smith Street, Brooklyn, NY 11231

New building filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is objections.

The examiner raised objections. The applicant has to resolve them before the filing can be approved. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00643705-S4

475 Smith Street

Brooklyn, NY 11231

New building · status dated Mar 30, 2022

Current record
Under review
Proposed scale
4 stories
Dwelling units
70
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00643705-S4 as a new building at 475 Smith Street, Brooklyn, NY 11231. Its latest published status category is Under review, dated Mar 30, 2022. The filing records 4 proposed stories and 70 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Mar 30, 2022
Proposed scale
4 proposed stories and 70 proposed dwelling units
Applicant of recordSee the 390 filings that name Mg Engineering D.P.C.
FiledDec 21, 2021
Current recordUnder review
Proposed scale4 stories
Recorded cost$10M

What the filing says

A public-record reading of the proposed work.

Plumbing, sprinkler and standpipe work on 1-9 & rof, as shown on plans (d6w)

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00643705-S4.

    01
  2. Current status updated

    The latest recorded filing status is “Objections.”

    02

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00643705-S4
BIN
3429242
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
70
plumbingsprinklerstandpipe