What the filing says
A public-record reading of the proposed work.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold top of the sidewalk shed at west 130th street and rear yard elevations.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 9,878 sq ft lot.
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- R7A
- Lot area
- 9,878 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01117774-S3.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
Scope and identifiers
The details used to match this filing.
- DOB filing number
- M01117774-S3
- BBL
- 1019690006
- Review type
- Professional Certification
- Existing stories
- Not recorded
- Proposed stories
- Not recorded
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








